The Board has initiated spring beautification tasks.  Below is a quick summary of tasks completed and planned over the next 30-60 days:

  • Beck Road clean-up – remove growth along tree line – Complete
  • Gyde road entrance in front of Janice Gall’s house (Lot 28) – remove growth – complete
  • Installation of mulch on all the islands – complete
  • Dig out blocked areas in creek that runs along pond (Lots 52/53/54) – complete
  • Remove broken limbs / branches in willow tree behind Don Plester’s house – complete
  • Remove debris and clear sewer gate on south end of pond – complete
  • Remove fallen trees and dead branches along Gyde road behind lots 37/38 – edge of the property line, one in the very corner that backs up to Oxford Park (adjacent sub on Gyde) and the one that is right along the edge of the commons behind Lot 37 – complete
  • Abraham landscaping clean-up – Completed 4/8
  • Trash and branch clean-up along Gyde Rd, trash clean-up in Beck road ditch – Completed 4/10
  • Sprinkler turn-on – mid May
  • Flower Planting at the entrances – Late May
  • Other items identified during the spring walkthrough of the sub (to be prioritized)
    • Remove dead tree behind Lots 26/27 in Brampton Dr commons area